Treating the entire sea water system on a offshore platform - CNOOC

Company: CNOOC, China

Flansh before Merus installation

About the customer:
CNOOC - Chinese Offshore Oil Company is one of the largest state-owned oil giants in China as well as the largest offshore oil and gas producer off the country.  As one of the worlds largest independent company, CNOOC has four major producing areas offshore China, mainly in the Chinese  Sea. Moreover their operations have now expanded in the Gulf of Mexico, North of Indonesia and in the North Sea. When totaled, CNOOC today is  operating more then 20 manned offshore platforms for production as well as exploration of new Oil and Gas fields.

The Problem:
Offshore the major source of water for all the oil platforms or drilling rigs is the sea. Depending of the area the seawater holds either a lot of Salt and or Calcium Carbonate, which are both causing problems. This seawater is used for a variety of purposes the foremost being cooling processes. For applications where a better quality of water is required, the seawater is being treated in several steps to fulfill the requirement for drinking/potable water and the requirements for the feed water for a steam boiler and many other sensitive machinery and equipment. Nonetheless, even despite the treatment either by RO, softening salts and/or the like, the problems with Scaling, Corrosion, Fouling and Bio growth were still persistent without much relief. This not only added to the maintenance costs, but also caused frequent shutdowns which consequently led to production loss.


Same flansh a few month after the installationThe Solution:
To secure the entire loop and deter the problems mentioned above, several Merus Rings were installed across the water systems, as can be observed in the five block diagrams shown below. By treating the water from the main suction header itself, the oscillations emitted by the Merus Rings, had a far higher prosperity to reach all corners of the water system and the related machinery. There were also several additional Merus Rings installed ahead of functionally critical machinery and processes which required more inhibition as the entire system was suspected to already be scaled/fouled to a certain degree.

Merus methodology:
In this case, Merus Technology was not only expected to prevent further deposition, but also gradually remove the existing deposition. For the scaling issues, Merus Rings increase the solubility of Calcium Carbonate and salt in the seawater. By doing so, the existing scale has more room within the water itself thus removing the existing scale and preventing further deposition. The major form of scaling in the water system were of NaCl and CaCo3.
To deter the corrosion rate, break the existing rust. This results in removal of existing corrosion layers and prevents further damage.

Implementing the Merus Rings:
In early 2008, Merus was sought to demonstrate the technology on a few critical applications and machinery. Just after a few weeks the maintenance crew observed drastic improvements in their critical systems. The cooling efficiency as well as the heating efficiency was maintained, operation time of these equipment increased, maintenance scheduled was extended and the water for the sanitary indicated a clear improvement as well.

After 3 months of operation with the Merus Rings installed, all the equipments, machinery, heat exchangers, boilers etc which were secured by the Merus Rings were opened for visual inspection. To the customers delight, in a majority of the machinery, no corrosion was found and in the others a clear improvement was observed compared to the situation before the installation of the Merus Rings. It was then communicated to them, that just within a short period of time, even the marginal corrosion and scale found in some of their machinery would be flushed out of their cooling loop. After this period, an order was released to equip and secure all the platforms of CNOOC in China.
End of 2009 a technical revision of all the new technology was done by CNOOC. Again the results have been very good. The pipes and machines,  which haven't been fully clean at the first check short after the installation, have now all been totally cleaned. No shutdowns due to water problems have been reported, since the installation of the Merus Rings.
If only the maintenance costs are taken as basis for ROI derivation, the ROI for the customer using Merus Technology has been less then 6 month. What we have established on the aftermath is to evaluate and calculate are the savings in the long term benefit derived from increased operational time of the machinery and the equipment, increase lifetime of these equipment as well as the increased production rate achieved by avoiding the shutdown due to seawater induced problems. 
With our experience in several other projects undertaken by Merus technology, we can observe that Merus Rings are able to bring down corrosion rate from 10 mpy top less then 1 mpy in a short period of time; and also maintain these much reduced corrosion rates. The financial savings based on the above index alone would amount to millions of dollars a year.