news-and-events
merus-worldwide
PDF Print
Article Index
Take the Tour
Page 2
Page 3
Page 4
Page 5
Page 6
All Pages

the productTake the tour

operation conditions

Merus works with energy indirectly provided by the ambient temperature. The active oscillations of Merus are subject to certain interferences caused by environmental influences like for example electromagnetic pollution with substantial power. Depending on their intensity these influences are capable of reducing or even erasing the impact of Merus on water. Hence Merus devices have to be installed with a clearance of at least 50 cm to any electric conductor.

It has been detected that sometimes interferences from within, thus caused by the water or the water pipe itself, affect the device. Here Merus Engineers have devices to measure electrical fields at the place of installation, to ensure Merus Ring is installed at the best possible position and so ensure the best possible results.

next for industrial applications >>
next for residential use >>
Merusindustrie Merusdorf